- Using a range of data, to what extent does there seem to be a need for redevelopment in Poole? (8 Marks)
I take it for this question, you'd talk about the employment structure at the SOA's near hamworthy gate and near the more populated inner city areas?
•
- 'Poole is already overcrowded and over developed. Hamworthy Gate should be returned to nature or used as parkland for the people of the Borough'. To what extent do you agree with this statement. (15 Marks)
This is a 15 mark question, so is it two different arguments?
What two arguments would you choose to talk about, i'm a bit stumped by this
•
- 'A lot of time and money has gone into the design of the Twin Sails Bridge, but little thought seems to have been taken over the road network'. What fieldwork data would you collect in order to prove/disprove this statement?
This is okay actually! I think you'd talk about doing a traffic survey on the old bridge to collect stats on how many cars currently use the old bridge and if congestion is a major problem?
•
- Any regeneration of the old power station site will need careful management. Discuss the evidence for this. (10 marks)
You'd talk about the appropriate assessment? As in the restriction of penumatic drills to 300Meters to reduce the noise which affects the wildlife? etc?
•
- Taking into account the conclusions of the Appropriate Assessment, describe some of the main features that the development should have (10 Marks)
Same as above?
•
- Identify the main issues that have led to the building of the TSB and justify its design features. (12 marks)
design features?
All i know is that the pictures look a million times better than what it actually looks like
•
- Discuss the extent to which the opening of the TSB will aid regeneration in Poole (10 marks)
I have a sheet for this: you'd talk about..
•
PRO: reduce congestion -20k car trips a day
•
Links the 26HA of land at hamworthy gate with rest of town
•
Iconic design- flagship project which will attract new investors
•
CONS: Link roads are confusing
•
CONS: Big lorries not allowed near residential areas, so they'd have to use old bridge
•