The Student Room Group

Work-energy question from Mechanics

An object of mass 1kg slides 3m down a roof inclined at 20 degrees to the horizontal. The object then falls 5m under gravity to hit the ground with speed 8m/s. Find the frictional force between the tile and the roof.

The answer given in the book is 9.42N.

Here's where I'm stuck, assuming no resistance forces act while falling, the kinetic energy gained by the object is 50 Joules. However the kinetic energy at 8m/s is 32 Joules. I can't find the speed at which the object just starts to fall.

Thanks.

Scroll to see replies

Original post by Ethan7702
An object of mass 1kg slides 3m down a roof inclined at 20 degrees to the horizontal. The object then falls 5m under gravity to hit the ground with speed 8m/s. Find the frictional force between the tile and the roof.

The answer given in the book is 9.42N.

Here's where I'm stuck, assuming no resistance forces act while falling, the kinetic energy gained by the object is 50 Joules. However the kinetic energy at 8m/s is 32 Joules. I can't find the speed at which the object just starts to fall.

Thanks.


No idea where you got the 50 Joules from.

Trying to do it via considering the speeds is going to be rather involved at best, since you don't know what the final vertical velocity is. It's probably doable, but I wouldn't fancy trying it via that method.

Since we're talking energy, I'd use conservation of energy. Works out easily - I assume you're using g=10 m/s/s.
Edit: Applied to the whole motion from start to hitting the ground.
(edited 4 years ago)
Reply 2
Original post by ghostwalker
No idea where you got the 50 Joules from.

Trying to do it via considering the speeds is going to be rather involved at best, since you don't know what the final vertical velocity is. It's probably doable, but I wouldn't fancy trying it via that method.

Since we're talking energy, I'd use conservation of energy. Works out easily - I assume you're using g=10 m/s/s.
Edit: Applied to the whole motion from start to hitting the ground.

I thought the lost PE would be the gained KE, so I assumed the GPE lost to falling( 1 * 10 * 5 = 50 J ) was converted to KE.
I still can't wrap my head around the process, could you please give me some pointers?
Original post by Ethan7702
I thought the lost PE would be the gained KE, so I assumed the GPE lost to falling( 1 * 10 * 5 = 50 J ) was converted to KE.
I still can't wrap my head around the process, could you please give me some pointers?


OK, you want to work with the whole motion from when it starts to slide to when it hits the ground.

Consider:

What's the loss in GPE (sliding down the roof and then falling)?

What's the gain in KE?

So, what's the energy lost to friction on the roof (i.e. work done against friction)?

Then it's a simple case of "Work done" = "Force" X "distance moved in the direction of that force".
Can't we find the final vertical velocity using v^2 = u^2 + 2as ?
Because we have v = 8 m/s a = 10 m/s^2 s = 5 m
(edited 3 years ago)
Original post by wasabiandyogurt
Can't we find the final vertical velocity using v^2 = u^2 + 2as ?
Because we have v = 8 m/s a = 10 m/s^2 s = 5 m


You are considering vertical motion, in which case v would be the final vertical velocity. Since it's been sliding down an inclined roof the final speed of 8m/s when it hits the ground is not vertical.
Original post by ghostwalker
You are considering vertical motion, in which case v would be the final vertical velocity. Since it's been sliding down an inclined roof the final speed of 8m/s when it hits the ground is not vertical.

But the initial velocity of the vertical motion can be the final for the motion along the inclined roof right?
Original post by ghostwalker
You are considering vertical motion, in which case v would be the final vertical velocity. Since it's been sliding down an inclined roof the final speed of 8m/s when it hits the ground is not vertical.


Did you get the answer? I have been working on this for hours.
If you have, would you please share me some perspective on how to solve it?
Original post by wasabiandyogurt
But the initial velocity of the vertical motion can be the final for the motion along the inclined roof right?


I suggest you call it freefall, rather than vertical motion, since the motion once it leaves the roof is not vertical! The velocity when it leaves the roof is at an angle of 20 degrees to the horizontal.

Original post by wasabiandyogurt
Did you get the answer? I have been working on this for hours.
If you have, would you please share me some perspective on how to solve it?


I've not worked it through. Read the thread - I've gave a method 10 months ago!
Original post by ghostwalker
I suggest you call it freefall, rather than vertical motion, since the motion once it leaves the roof is not vertical! The velocity when it leaves the roof is at an angle of 20 degrees to the horizontal.



I've not worked it through. Read the thread - I've gave a method 10 months ago!

Oh, that is true, I never considered that. But I didn't understand the method of the conservation of motion, I am new to the subject myself. It's alright, I will try it again or I guess I have to wait for the teacher to solve it.

Thank you so much!
Original post by wasabiandyogurt
Oh, that is true, I never considered that. But I didn't understand the method of the conservation of motion.


Not clear what you mean by the "method of the conservation of motion".

Looking in more detail, the original question is inconsistent, so if you try and do it using suvat you will run into problems.

The change in vertical height for the freefall part would result in a vertical velocity of 10m/s if the mass started with zero vertical velocity. Since it already had some downward velocity when it started that part; when it hits the ground, the vertical velocity must be >10m/s and consequently the overall speed must be >10m/s. So, the given speed of 8m/s is impossible.

Edit: Actually, this was the OP's original issue, though I didn't realise it at the time. Any attempt to split the motion up into two parts, whether using suvat or energy considerations runs into this problem (of falling foul of the error in the question).
(edited 3 years ago)
Original post by ghostwalker
Not clear what you mean by the "method of the conservation of motion".

Looking in more detail, the original question is inconsistent, so if you try and do it using suvat you will run into problems.

The change in vertical height for the freefall part would result in a vertical velocity of 10m/s even if the mass started with zero vertical velocity. Since it already had some downward velocity when it started that part; when it hits the ground, the vertical velocity must be >10m/s and consequently the overall speed must be >10m/s. So, the given speed of 8m/s is impossible.

Edit: Actually, this was the OP's original issue, though I didn't realise it at the time. Any attempt to split the motion up into two parts, whether using suvat or energy considerations runs into this problem (of falling foul of the error in the question).


Sorry, I meant 'conservation of energy'.

So, basically, the question is wrong?
Original post by wasabiandyogurt
Sorry, I meant 'conservation of energy'.

So, basically, the question is wrong?


You should be able to get to the desired answer if you use the method I suggested - not actually worked it out myself.

Question is wrong in the sense that the information given is not consistent. It's a bit like saying a rod ABC is 4m long (and the question was worked out using that information), and AB = 3m and BC = 2m. It's an impossible situation. As long as you don't need to use the distances AB and BC, you don't have problem, but if you chose a method that requires them you'll run into trouble.
Original post by ghostwalker
You should be able to get to the desired answer if you use the method I suggested - not actually worked it out myself.

Question is wrong in the sense that the information given is not consistent. It's a bit like saying a rod ABC is 4m long (and the question was worked out using that information), and AB = 3m and BC = 2m. It's an impossible situation. As long as you don't need to use the distances AB and BC, you don't have problem, but if you chose a method that requires them you'll run into trouble.


I got the answer! But we have to assume the tile falls off the roof vertically.
Thank you very much! You helped a lot.
Reply 14
Original post by ghostwalker
You should be able to get to the desired answer if you use the method I suggested - not actually worked it out myself.

Question is wrong in the sense that the information given is not consistent. It's a bit like saying a rod ABC is 4m long (and the question was worked out using that information), and AB = 3m and BC = 2m. It's an impossible situation. As long as you don't need to use the distances AB and BC, you don't have problem, but if you chose a method that requires them you'll run into trouble.

Agreed. Given I've found a couple more wrong questions further ahead in my book, it's may not be unlikely that the info in the question is incorrect. I think it'll be wise to delete the thread.
Original post by Ethan7702
I think it'll be wise to delete the thread.


Then the next person doing the question would have the same problem and the process would have to be repeated all over again.

The whole point of leaving threads is that they become a resource for future students.
Original post by wasabiandyogurt
I got the answer! But we have to assume the tile falls off the roof vertically.
Thank you very much! You helped a lot.


I've worked it through now using the method I suggested and get 9.42N; and that doesn't require the assumption of the tile falling vertically.

What was your method then, that required the tile falls vertically?
Original post by ghostwalker
I've worked it through now using the method I suggested and get 9.42N; and that doesn't require the assumption of the tile falling vertically.

What was your method then, that required the tile falls vertically?

Well, first I used v^2 = u^2 + 2as and found the initial velocity of the motion which is 6ms^-1.
Then we used that for the motion on the roof. u = 0 ms^-1 and v= 6 ms^-1

We found the loss of kinetic energy using the speeds = 18 J

We found the gravitational potential change as well using (1 * 10 * 3sin 20) = 10.26 J

The we had to sum them up and divide by 3 to get the answer = 9.42 J

I feel confused however because we had to sum up the loss of energies at the end but otherwise this is what was done.
Original post by ghostwalker
I've worked it through now using the method I suggested and get 9.42N; and that doesn't require the assumption of the tile falling vertically.

What was your method then, that required the tile falls vertically?

Would you also mind sharing your method? It seems more accurate.
Original post by wasabiandyogurt
Well, first I used v^2 = u^2 + 2as and found the initial velocity of the motion which is 6ms^-1.
Then we used that for the motion on the roof. u = 0 ms^-1 and v= 6 ms^-1

We found the loss of kinetic energy using the speeds = 18 J

We found the gravitational potential change as well using (1 * 10 * 3sin 20) = 10.26 J

The we had to sum them up and divide by 3 to get the answer = 9.42 J

I feel confused however because we had to sum up the loss of energies at the end but otherwise this is what was done.


If you assume that the 8m/s on impact is vertical you would have:

64=u^2+2x10x5

So, u^2= -36 which is impossible - you can't just ignore the sign.


As to the method I used:

Loss in GPE =mg(5+3sin20)= mg(5+3\sin20)

Gain in KE = 12m82=32m\frac{1}{2}m8^2=32m - this does not assume movement is vertical.

So, work done on roof = "loss in GPE" - "gain in KE"

And this equals force x distance moved, 3F

Since m=1, put it all together to get:


3F=g(5+3sin20)323F= g(5+3\sin20)-32

and solve for F.

Quick Reply

Latest